  1. igniting:

the principal should be responsible for it. the duty monitor will operate and also work with kiln team together. put some timber in the gate and make them even,then spill some certain engine oil on it.begin to ignite(then close the manhole).make them fully burning .when igniting,should open the air relief valve & close the junction valve to the gas main pipe.

  1. after the timber burn fully add in amount of coal in the furnace step by step. then start the blast furnace to support burning. when the temperature of gas outlet reaches 600℃, add 2 hoppers of coal & blast much to keep it burning for 20minutes. stop the wind & watch the burning state. if the fire burns well. that’s ok. if not even, should reduce or stop the wind, then stir the burning timber with one steel bar to keep them burning evenly. otherwise,reignite.
  2. when coal layer reach certain thickness, begin to produce steam, the discharged gas colour turns from white (steam) to gray, carbon black, to black till up to tan color. it shows the gas quality has reached the requirement.
  3. sampling & test the gas quality. if the content of co is over -20%, o2 content below 0.5% , can supply the gas to the kiln.

(c)gas supply

  1. open the water seal dump valve to supply to gas main pipe(close coal gas burner, valve & bell hood valve), meanwhile, open tail bleeder valve of the pipe. after 10-20 minutes, sampling & trial fire.   if succeed, begin to supply gas to the burner.
  2. before ignite the burner, must open second-blast gate firstly .   then clcan out the hearth & exhaust remained gas in the furnace & pipe.
  3. close second-blast gate.
  4. prepare one stick for igniting . don’t ignite until the sampling is qualified & close bleeder valve . watch the fire & coal gas , avoid overfull gas gathering . not allow to ignite by the exploding ways.
  5. the igniting person can’t plumb in the face of the gate . not allow anyone standing by the gate & other manhole of the furnace.
  6. when the burner is ignited, watch the fire & increase second-wind gradually. then adjust the air valveof the burner to keep burning steadily.
  7. if the burner can’t spray the fire , shows the gas quality is not good or insufficient . should blow away the remained gas thoroughly . then repeat above steps to ignite & supply gas after 5 mimutes.

ⅵ、gasification operation

  1. operating precautions

(1)the stoker on duty should often watch for all of instruments’ work status.once find something wrong, must repair at once.

(2)should define duties to the operation of power cut & gas supply . the stoker mustn’t leave his post without allowance while on duty.

(3)don’t open the atmoseal before open the viewing hole. it’s the principle that the amount of steam can seal off the coal gas. after finished the operating, must cover the lid first, then close the atmoseal.

(4)overall check stove layer& wind pressure temperature once every 2 hours and make good records factually.

(5)adjust the amount of coal & wind and clear out the ash slag in time according to the stove chamber status. and make detailed records on the time & amount of cleaning the slags.

(6)often inspect & adjust concerned part positions including water overflow, cooling water flow & the level high or low of the water lute.

(7)the pressure of the gas outlet should be at least 25mm water column so as to avoid kiln backfire.

(8)the temperature can’t be over 550℃. must strictly control the ash layer to prevent the wind-hood burnt out.

(9)when several furnaces work at the same time, the pressure of each one must exceed main pipe so as to avoid the gas flow backwards & the blast.

(10)           when stop the steam, should use replaced stcan to supply wind & viewing hole air-seal. or reduce the blast amount and keep the viewing hole closed.

  1. operation

(1)should control the amount of coal according to the gas quantity demanded of the furnace, the outlet temperature’s high or low, coal layer thickness & other conditions.

(2)feed coal more times, less amount. and should watch for the coal’s thickness & distribution to make them even & wine colour.

(3)should feed the coal in time & do it as the operation regulations & rules. no matter whenever feed the coal, can’t do it under the condition of the part burning so avoid the temperature fall.

(4)stir the coal layer now ang again to keep them distributing & temperature evenly. when stir the coal layer, should operate one to two circles. and also disperse the slag.

(5)if part coal layer gets thinner, should add the coal in time & keep them even distributing. the difference can’t be more than 100-150mm.

(6)adjustment of wind & gas amount: wind should be consistent with gas, can’t be greater wind


关于冀州市德晔环能有限公司商铺首页 | 更多产品 | 更多新闻 | 联系方式 | 黄页介绍
主要经营:环保节能设备;煤气发生炉;热交换器;硫酸钾肥设备
冀州市德晔环能有限公司是座落于古城冀州,大广高速与106国道之间,毗邻风景秀丽的衡水湖,占地约20000平方米,交通便利。我公司1999年建厂,是生产环保节能设备、煤气发生炉、热交换器、硫酸钾肥设备等产品的专业生产厂家,拥有完整、科学的质量管理体系,是集设计、生产、制造、安装一体化的专业队伍。产品广泛用于各个领域,如冶金、建材、陶瓷、耐火材料、玻璃、化工、碳素、民用等多个行业。经过多年的努力,依靠雄厚的技术力量和诚信的服务,占领了广阔的市场,客户遍及全国及东南亚、北非、拉美等地区,并得到用户一致好评。公司的诚信、实力和产品质量获得业界的认可。我们始终遵循以节约能源和保 ...
内容声明:顺企网为第三方交易平台及互联网信息服务提供者,顺企网所展示的信息内容系由冀州市德晔环能有限公司经营者发布,其真实性、准确性和合法性均由店铺经营者负责。顺企网提醒您购买前注意谨慎核实,如您对信息有任何疑问的,请在购买前通过电话与商家沟通确认顺企网存在海量企业商铺和供求信息,如您发现店铺内有任何违法/侵权信息,请立即向顺企网举报并提供有效线索。
您可能喜欢
顺企网 | 公司 | 黄页 | 产品 | 采购 | 资讯 | 免费注册 轻松建站
免责声明:本站信息由企业注册和来自工商局网站, 本站完全免费,交易请核实资质,谨防诈骗,如有侵权请联系我们   法律声明  联系顺企网
ICP备案: 粤B2-20160116 / 粤ICP备12079258号 / 互联网药品信息服务资格证:(粤)-经营性-2016-0009 / 粤公网安备 44030702000007号
© 11467.com 顺企网版权所有 发布批发采购信息、查询企业黄页,上顺企网